Construction material yard
← All divisions Division 02

Construction Material Supply

Contractors lose programme to material gaps far more often than to labour. We buy against the bill of quantities, hold the consignment, and release it to site on the dates the programme calls for — so the site carries schedule, not inventory. Because the same company clears and trucks the goods, a slipped vessel is absorbed in our planning rather than surfacing as a stoppage.

Cement & binders
OPC and SRC in 50 kg bags or bulk tanker, plus GGBS and fly ash for specified low-heat mixes. Mill test certificates issued per despatch.
Reinforcement steel
Deformed bar in grades B500B and B500C, 8–40 mm, cut-and-bent to schedule or supplied in stock lengths, with mesh and binding wire.
Aggregates & sand
Washed and graded aggregate, crusher run and screened sand delivered by tipper against sieve analysis reports.
Pipes & fittings
GRP, HDPE, uPVC and ductile iron for sewerage and water networks, with manholes, valves, couplings and gaskets supplied as matched sets.
Blockwork & finishes
Solid and hollow blocks, screed, waterproofing membranes and formwork consumables for structural and fit-out phases.
Quality assurance
Third-party laboratory testing arranged before release, with certificates cross-referenced to batch and delivery note for consultant approval.
Delivery terms
Ex-yard, delivered-to-site or call-off from held stock, scheduled by half-day window and coordinated to the crane plan.